{"count":1,"message":"Results returned successfully","results":[{"odiNumber":10488065,"manufacturer":"Chrysler (FCA US, LLC)","crash":false,"fire":false,"numberOfInjuries":0,"numberOfDeaths":0,"dateOfIncident":"11/23/2012","dateComplaintFiled":"12/12/2012","vin":"1B3ES56C74D","components":"ELECTRICAL SYSTEM,EXTERIOR LIGHTING","summary":"JUST HAD THE INSTRUMENT PANEL REPLACED DUE TO A FRIED POWER TRANSISTOR ON THE I/C BOARD. REPAIR LASTED ABOUT 1 HOUR AND THEN REPLACEMENT INSTRUMENT PANEL FAILED ALSO. APPEARS TO BE A SHORT IN THE DASH LIGHT CIRCUIT. THIS CAUSES FUSE # 15 TO BLOW WHICH REMOVES POWER FROM THE PARKING LIGHTS, AND THE TAIL LIGHTS.  *TR","products":[{"type":"Vehicle","productYear":"2004","productMake":"DODGE","productModel":"NEON","manufacturer":"Chrysler (FCA US, LLC)"}]}]}