{"Count":4,"Message":"Results returned successfully","results":[{"Manufacturer":"STREAMLINE/GUERDON DIV.","NHTSACampaignNumber":"73V224000","parkIt":false,"parkOutSide":false,"overTheAirUpdate":false,"ReportReceivedDate":"21/11/1973","Component":"EQUIPMENT:RECREATIONAL VEHICLE/TRAILER:LPG SYSTEMS:LINES AND FITTINGS","PotentialNumberofUnitsAffected":41,"Summary":null,"Consequence":null,"Remedy":null,"Notes":"STREAMLINE CAMPAIGN NO N/A.  23', 25', 27', 29', 31', AND 33', SL, REGENCY,IMPERIAL, CROWN IMPERIAL.  POSSIBILITY THAT A MALFUNCTIONING TOOL IMPROPERLYFLARED COPPER GAS LINE TUBING USED FROM GAS MANIFOLD TO APPLIANCES.  (CORRECTBY INSPECTING AND REPLACING WITH PROPERLYFLARED TUBING).","ModelYear":"1974","Make":"STREAMLINE","Model":"CROWN IMPERIAL"},{"Manufacturer":"STREAMLINE/GUERDON DIV.","NHTSACampaignNumber":"73V224000","parkIt":false,"parkOutSide":false,"overTheAirUpdate":false,"ReportReceivedDate":"21/11/1973","Component":"EQUIPMENT:RECREATIONAL VEHICLE/TRAILER:LPG SYSTEMS:LINES AND FITTINGS","PotentialNumberofUnitsAffected":41,"Summary":null,"Consequence":null,"Remedy":null,"Notes":"STREAMLINE CAMPAIGN NO N/A.  23', 25', 27', 29', 31', AND 33', SL, REGENCY,IMPERIAL, CROWN IMPERIAL.  POSSIBILITY THAT A MALFUNCTIONING TOOL IMPROPERLYFLARED COPPER GAS LINE TUBING USED FROM GAS MANIFOLD TO APPLIANCES.  (CORRECTBY INSPECTING AND REPLACING WITH PROPERLYFLARED TUBING).","ModelYear":"1974","Make":"STREAMLINE","Model":"REGENCY"},{"Manufacturer":"STREAMLINE/GUERDON DIV.","NHTSACampaignNumber":"73V224000","parkIt":false,"parkOutSide":false,"overTheAirUpdate":false,"ReportReceivedDate":"21/11/1973","Component":"EQUIPMENT:RECREATIONAL VEHICLE/TRAILER:LPG SYSTEMS:LINES AND FITTINGS","PotentialNumberofUnitsAffected":41,"Summary":null,"Consequence":null,"Remedy":null,"Notes":"STREAMLINE CAMPAIGN NO N/A.  23', 25', 27', 29', 31', AND 33', SL, REGENCY,IMPERIAL, CROWN IMPERIAL.  POSSIBILITY THAT A MALFUNCTIONING TOOL IMPROPERLYFLARED COPPER GAS LINE TUBING USED FROM GAS MANIFOLD TO APPLIANCES.  (CORRECTBY INSPECTING AND REPLACING WITH PROPERLYFLARED TUBING).","ModelYear":"1974","Make":"STREAMLINE","Model":"SL"},{"Manufacturer":"STREAMLINE/GUERDON DIV.","NHTSACampaignNumber":"73V224000","parkIt":false,"parkOutSide":false,"overTheAirUpdate":false,"ReportReceivedDate":"21/11/1973","Component":"EQUIPMENT:RECREATIONAL VEHICLE/TRAILER:LPG SYSTEMS:LINES AND FITTINGS","PotentialNumberofUnitsAffected":41,"Summary":null,"Consequence":null,"Remedy":null,"Notes":"STREAMLINE CAMPAIGN NO N/A.  23', 25', 27', 29', 31', AND 33', SL, REGENCY,IMPERIAL, CROWN IMPERIAL.  POSSIBILITY THAT A MALFUNCTIONING TOOL IMPROPERLYFLARED COPPER GAS LINE TUBING USED FROM GAS MANIFOLD TO APPLIANCES.  (CORRECTBY INSPECTING AND REPLACING WITH PROPERLYFLARED TUBING).","ModelYear":"1974","Make":"STREAMLINE","Model":"IMPERIAL"}]}